This assigned project was while I was under contact with AIC. For the City of New York, Department of Transportation Bridges / Roadways. Manhattan Approach Electrolier Restoration, Queensboro Bridge. For the production information of the Fabrication and Erection drawing I had to field study the removed and dismantled light fixture. The assignment was to restore, retrofit fixture glass globes and improve on lighting source with installing lighting power delivery conduit. Redesigning the interior armature support system.
To view the drawings on this project:
1) Download Autodesk Design Review (free)
2) Open the project drawings
BACK TO MISCELLANEOUS METALS, DESIGN & DETAILING |